Find an Expert
Wireless Telecom Systems Engineering; Electrical Engineering; Radio, Microwave, Cellular
Has designed high-speed microwave radio systems carrying OC-3 (155 Mbps) and IP systems to 300 Mbps. This work includes field surveys of the proposed radio paths, detailed analysis to determine antenna heights and diversity requirements over a variety of propagation…
Structural Engineering; Construction, Failure Investigation of Building Structures
Over 20 years of professional experience in many aspects of structural design in a fast-track environment including reinforced concrete, steel, masonry, timber, aluminum structures, and their foundations, both shallow type and deep foundation systems. This work includes foundation for pre-engineered…
Data Analysis, Physics & Astronomy, and Technical Project Management
He has designed and built electronics for spaceflight and stratospheric balloon payloads. These electronics systems have included embedded computers running real-time and Linux operating systems, data acquisition electronics, particle detector electronics, and low-speed control systems. In each case, a small…
Software, Revenue Recognition, Financial Statement analysis, Commercial Real Estate
Expert has extensive experience working in the areas of financial statement analysis, revenue recognition, reconstruction accounting, evidence preservation, witness interviews and data preservation and analysis. Prior to founding Intuitive Associates, Inc., Expert was the Controller at Avega Health Systems, Inc.…
Combustion, Combustor Design, Combustor Acoustical Problems, Analysis, CFD, Engineering Design
Expert designed and tested missles and spacecraft in many Hypersonic wind tunnels at elevated temperatures and pressures from Mach 3 simulation to Mach 8 simulation at NASA. The expertise included test procedures for starting such facilities and techniques to avoid…
Mechanical Engineering Design and Analysis
Expert has more than 30 years of experience in providing mechanical engineering support to electronic and LASER products for military and commercial applications. He has performed in engineering, program, and supervisory roles including design, analysis, budgets, scheduling, manufacturing support, field…
Adhesive Consulting, Formulating, & Research in Structural, PSA, Hot Melt, Epoxy, Urethane, & Wood
Expert D. Expert has done adhesive failure analysis projects in connection with establishing cause in litigation cases or in research and production problems. For example, a wood millwork manufacturer claimed an adhesive was faulty, resulting in customer loss and damages.…
Management, New Product Development, and Plant Relocation and Startup
As part of top management's efforts to maximize revenue, growth and profitability, Expert has applied over 35 years of business, engineering and manufacturing expertise to provide cost effective solutions across a wide-range of industries. Expert maintains that it all starts…
Manufacturing, Project Management
Expert (pronounced ko-val-ski, ) has conducted seminars and instructed consultants on how to utilize state-of-the-art project management techniques. He can develop project plans and evaluate project management software and techniques. He can assist or critique how to set up, schedule,…
Integrated Business/Technology Planning, Strategic Planning, Small/Medium Business Analysis
Expert has a deep understanding of virtually all aspects of business development, including customer needs; operations efficiency and effectiveness. He has provided advice and counsel for numerous small businesses and has managed in-depth studies of telecommunications and information handling requirements…