Find an Expert
Polymer Synthesis and Properties, Catalysis, Physical-Organic Chemistry, and Molecular Modeling
Expert R. Expert has over 30 years R&D experience with major chemical companies in designing new organic polymers, developing and improving polymerization processes, and inventing new polymerization catalysts. His primary focus has been on exploratory research for new product and…
Thermal and Fluid Systems Engineering Design, Analysis, Sizing, and Project Management
Expert A. Expert has 36 years of experience in the analysis, design, and development of complex thermal systems for NASA and aerospace applications. During this time, Expert had a major role in defining the thermal system designs for the International…
Information Systems Specialist (Computer-Related and Otherwise)
Expert P. Expert (prefers “Expert”) has experience in building three major data centers including the installation of crisis avoidance technology such as uninterruptable power systems, fire detection/suppression, etc. He is also experienced in business contingency planning, disaster, and operational backup…
Infectious Diseases, Infection Control, Epidemiology, Public Health, and Pediatrics
Expert R. Expert was an author on the Centers for Disease Control and Prevention (CDC) Guideline for Prevention of Transmission of M. tuberculosis in Healthcare Settings and the WHO Guideline for Prevention of M. tuberculosis Transmission in Healthcare Settings in…
Adhesive Consulting, Formulating, & Research in Structural, PSA, Hot Melt, Epoxy, Urethane, & Wood
Expert D. Expert has done adhesive failure analysis projects in connection with establishing cause in litigation cases or in research and production problems. For example, a wood millwork manufacturer claimed an adhesive was faulty, resulting in customer loss and damages.…
Nondestructive Testing and Evaluation; Machine and Structural Design
Expert has been at (Undisclosed) where he currently is a professor in the Department of General Engineering. Expert is also Director of the Nondestructive Testing and Evaluation Research Laboratory. The Laboratory supports research work in ultrasonics (immersion, air-coupled, and water-squirt),…
Business, IT, and Knowledge Management
Expert's DBA(IS) studies provide a solid theoretical framework for understanding "the information economy," including knowledge management and e-business. In his regular work he has had practical experience of the tools that support knowledge management. For example: Expert has used e-mail,…
Engineering Management
Expert has been involved with the re-engineering of new product development processes, creation of total quality management programs, and organizational structure changes for process engineering and research and development functions for two major medical device manufacturers (i.e. Johnson & Johnson…
Lasers, Optics, Electro-Optics, Fiber-Optics, and Applications
Expert is thoroughly familiar with most types of gas, solid state, and semiconductor lasers. He contributed to the development of a diode-pumped solid-state lasers. He made design improvements to various continuous wave and flashlamp pumped solid state lasers to improve…
Package Development and Testing
Expert has over 25 years experience with the development, engineering, and troubleshooting associated with a variety of packages. She has developed and selected materials and components involving rigid plastics, cartons, and flexible packaging. She has designed and prepared specifications and…