Find an Expert
Identity and Image (Corporate Identity and Public Image) and Motivation
MTV, Hollywood's David Foster and Brian Wilson, Taiwan Trade, 300th Anniversary of the founding of St Petersburg, Russia, RosAtom, plasma waste management, bio-remediation fertilizers and carbon fiber production in the EEU, Expert has successfully designed and redesigned organizational entities domestically…
Architectural Structural and Forensic Engineering
His degree is a Bachelors of Architectural Engineering where he learned the application of engineering principles and technology to building design and construction. His specialty is in Structural Engineering but he took advanced courses in HVAC design as well as…
Wireless Telecom Systems Engineering; Electrical Engineering; Radio, Microwave, Cellular
Has designed high-speed microwave radio systems carrying OC-3 (155 Mbps) and IP systems to 300 Mbps. This work includes field surveys of the proposed radio paths, detailed analysis to determine antenna heights and diversity requirements over a variety of propagation…
Structural Engineering; Construction, Failure Investigation of Building Structures
Over 20 years of professional experience in many aspects of structural design in a fast-track environment including reinforced concrete, steel, masonry, timber, aluminum structures, and their foundations, both shallow type and deep foundation systems. This work includes foundation for pre-engineered…
Data Analysis, Physics & Astronomy, and Technical Project Management
He has designed and built electronics for spaceflight and stratospheric balloon payloads. These electronics systems have included embedded computers running real-time and Linux operating systems, data acquisition electronics, particle detector electronics, and low-speed control systems. In each case, a small…
Construction: Engineering, Management, Estimation, Sewer Line, GMP & Owner Contract, Office & Retail
He has worked in the Management side of construction for almost 40 years. He has held the positions of Field Engineer, Office Engineer, Project Engineer, Project manager, Senior Estimator, VP of estimating for both Domestic and International projects and President…
Refractories and Ceramics: Raw Materials, Manufacturing and Applications
During the last twenty years, he has been working on the development, production and quality control of kiln furniture for firing a wide variety of ceramic products. He is experienced in the manufacture of cordierite or cordierite-mullite, both standard and…
Filtration Membrane Processes and Equipment, Converting and Process Equipment Design and Startup
Professional Engineer (Chemical) with 20+ years of experience in process development, project engineering and project management roles. Expert provides multi-disciplined versatility with superb analytical skills to identify issues during equipment/facility design and construction, and provide solutions to keep projects on…
Golf and Sports Turf: Construction and Maintenance
Expert has used his knowledge and experience in Golf Course Construction to assist in the field and design areas of engineering horizontal construction as it relates to water movement and overall land-planning. Expert consistently stays abreast of the new developments…
Polymer Processing; Pilot Plant Design; Process Development
After 20 years working for chemical companies expert changed his career to work full-time on chemical plant design. He has worked 15 years for engineering and construction companies doing chemical plant design (chemicals, polymers, pharmaceutical and related fields). He continued…