Find an Expert
Oil Terminal Operations Troubleshooting, Contract Negotiation, Mechanical Issues, Oil Inventory Loss
He is a hands-on manager in chemical and fuel oil terminals. He has rebuilt and maintained terminals, done inventory control, handled union negotiations, safety procedures, pollution control and prevention. He has been a peer manager, construction manager, and purchasing agent.…
Software, Revenue Recognition, Financial Statement analysis, Commercial Real Estate
Expert has extensive experience working in the areas of financial statement analysis, revenue recognition, reconstruction accounting, evidence preservation, witness interviews and data preservation and analysis. Prior to founding Intuitive Associates, Inc., Expert was the Controller at Avega Health Systems, Inc.…
Chemical Process Industries, Waste Water and Air Pollution Control
Expert has wide ranging experience in the efficient application of Chemical Engineering principals such as Unit operations, Unit Processes and materials of construction towards economic & safe conversion of raw materials into useful products, and sound environmental stewardship. He has…
Industrial Hygiene, Safety, Indoor Air Quality, Mold, Asbestos, Lead Based Paint, Environmental
Performed indoor air quality assessments for over twenty years. Experienced in testing for fungi (mold), bacteria, endotoxins, allergens, volatile organic compounds (VOC), welding fume, asbestos, silica, particulates, and gases. Managed and performed numerous asbestos projects for over twenty years. Inspected…
Supplier Quality Assurance, Cost Improvement Projects, ISO 9001:2000 Quality Systems Management
- Expert audited suppliers to conformance with expected standards, such as TS 16949:2002 or ISO 9001:2000. An ISO standards based checklist was used; this provided quantitative scores for each category. Objective evidence and comments were compiled as the audits progressed.…
Construction Claims, Architecture, Interior Arch. Design
Expert is a seasoned Trial Attorney, Architect Emeritus, and Expert Witness, serving clients throughout the United States. With over 40 years of experience in construction law and the commercial, industrial, institutional, and residential building industry, Expert truly understands the legal…
Combustion, Combustor Design, Combustor Acoustical Problems, Analysis, CFD, Engineering Design
Expert designed and tested missles and spacecraft in many Hypersonic wind tunnels at elevated temperatures and pressures from Mach 3 simulation to Mach 8 simulation at NASA. The expertise included test procedures for starting such facilities and techniques to avoid…
Oil & Gas/LNG/Chemical Project Development & Management; Engineering & Construction
Expert F. Expert has applied professional chemical engineering knowledge, skills, and experience in evaluating, developing, and selecting alternative chemical process technologies, and has contributed to process improvements developed from existing technologies. Recent technical work involved devising an economical method to…
Engineering, Manufacturing Operations, and Building Products
Expert A. Expert has extensive experience in building construction, which has included eleven (11) manufacturing plants that ranged from greenfield sites to the modification of existing structures to incorporate the unique manufacturing requirements. Additionally Expert is a registered Professional Engineer…
Environmental Management, Experimental Designs, Refinery Processes
Expert C. Expert discovered and patented methods and catalysts for reducing SOx emissions from fluid catalytic cracking (FCC) operations. He designed and constructed testing equipment for fast turnaround and low cost screening of SOx catalysts. He has investigated refinery NOx…