Find an Expert

Expert ID: 727466 California, USA

Expert in Critical Path Method (CPM), Schedule Construction, Claims Analysis, Construction Management, Delay Damages

Expert provides expert critical path method (CPM) schedule development/review/analysis and construction claims analysis, expert witness testimony, and project management consulting, to the engineering and construction industry. Clients include, Owners, developers, contractors, law firms and surety insurance companies. Types of projects…

Expert ID: 730211 United Kingdom

Expert in Planning, Critical Path Analysis, Large Mergers, Program and Project Analytics, Geo Data Analysis

Expert has extensive experience in the planning, implementation and evaluation of projects and programmes in Financial Services, Retail and IT. An integration specialist, expert in Critical Path Analysis, he has a wealth of international business experience coupled to an in-depth…

Expert ID: 736250 California, USA

Expert in Aerospace and Defense, Technical Training, Medical Background

Senior Proposal and Program Manager with a proven 15-year record of accomplishment delivering winning proposals to Federal, State and Local Government solicitations. Expert has enjoyed a challenging, yet highly rewarding career utilizing key proposal development and program management best practices,…

Expert ID: 736165 Alabama, USA

Expert in Construction and Civil Engineering

Expert has been in the construction industry for over 30 years in various capacities including Estimator/Cost Engineer, Project Manager, Construction Manager, Director of Construction, and A/E Construction Administrator to name a few. He has been involved in both commercial and…

Expert ID: 736223 New Hampshire, USA

Expert in Professional Engineer / Project Manager

Professional Mechanical Engineer with 25 years experience managing and designing pipelines and facilities in the oil and gas industry. The last 10+ years have been managing many different facets of projects with emphasis on Earned Value and Project Controls. Considerable…

Expert ID: 735942 North Carolina, USA

Expert in Pharmacokinetics/Pharmacodynamics

Expert has over 37 years of experience in the pharmaceutical industry, including work as an independent consultant. As a consultant he offered preclinical and clinical pharmacokinetic, pharmacodynamic, and pharmacometric support services, with emphasis on providing strategic planning services throughout a…

Expert ID: 727492 California, USA

Expert in Surface Water Hydrology

Expert W. Expert is a hydrologist and natural resource scientist with over 18 years of professional experience in surface water hydrology and hydraulics, stormwater management, flood control, constructed wetland design, watershed analysis, erosion/sediment control, water control structure design, groundwater dynamics,…

Expert ID: 733385 Minnesota, USA

Expert in Pharmaceuticals: Formulations, Injectables, Topicals, Analgesics, Pharmaceutical Analysis

CORE SKILLS Instrumentation skills. APIs/preformulation: X-ray diffraction; Raman spectroscopy; HPLC (potency, degradants, purity, linearity, accuracy, precision, LOQ, LOD) with detection via UV-Vis, fluorescence, and conductivity; content uniformity, dissolution/elution incl. sustained- and immediate release formulations, paddle wheel apparatus; forced degradation incl.…

Expert ID: 735677 California, USA

Expert in Industrial Engineering

Expert is an industrial Engineer with 16 years of experience, which is focused on Lean Six Sigma process improvement, Project Management & Capacity Analysis/ Factory Layout design. Expert is a certified PMP & ASQ Six Sigma Black Belt. Applications: Minitab,…

Expert ID: 726234 Minnesota, USA

Expert in machine tools, heavy equipment, and aerospace manufacturing technologies.

Expert began using CAM in its earliest stages, using Compact II and DataCut to created machine instructions to Numerically Controlled (NC) Machine Tools. He advanced to writing scripts and macros in Automatically Programmed Tools (APT) to perform machining functions around…

Dev Tool:

Request: experts/critical-path-method
Matched Rewrite Rule: ^experts\/([^\/]*)\/?([^\/]*)\/?
Matched Rewrite Query: pagename=experts&searchKeyword=critical-path-method&searchDiscipline=
Loaded Template: page-experts.php