Find an Expert
Process Plant Design and De-bottlenecking, Gas Phase Polymerization and Material Handling
Expert has two decades of process plant expertise with significant proficiency developed in polyethylene and polypropylene technology, process evaluation and plant design. Expert has applied his process engineering knowledge to improvements, optimization, trouble-shooting and projects in chemical and petrochemical plant…
Manufacturing, Engineering, and Defence Industry Improvement and Change Management
Expert has worked with organisations to identify where they are working effectively and where they need to be transformed to either effectively deliver to their existing customer community or to a changing customer community. This is particularly pertinant where organisations…
Phased Array Radar Systems, Antenna, Microwave, Guidance and Control Systems
Expert has more than 20 years with defense industry (Lockheed Martin, and Raytheon). He is a Radar System Expert and Analyst of Radar System performance and Phased Array Radar Systems for more than 15 years (recently designed EQ-36 mortar radar,…
Site, Infrastructure, Building Construction and Development (all aspects including safety issues)
Expert has extensive experience through management positions in site, infrastructure, building construction, and land development. His initial construction experience was obtained in construction of roads, streets and highways, other infrastructure, public works projects, and extensive site preparation for commercial and…
Microelectronics, Nanotechnology, Semiconductors, Memory
Expert has nearly 10 years of experience in solid state device development in a wide range of material systems. As a senior process engineer at Global Communication Semiconductors, he has provided internal advice about epitaxial layer selection from different compound…
Engineering Cokeless Furnaces, Slurry Pipelines, Slurry Hydrocracking, Oilsand Engineering, and Tailings
Expert is a specialist in the design of gas-fired furnaces for melting of metals. He received in 2017 a grant from the National Science Foundation for the design of a cokeless melting system for ferrous castings. Expert is the author…
Warehouse Expense Reduction: Minimizing Damage, Error and Labor Cost
He is an expert consultant with 20+ years in the field of warehouse industrial engineering, complete with a comprehensive understanding of logistic processes, labour standards, and distribution efficiencies. His “big picture” perspective – which includes an understanding of the way…
Critical Path Method (CPM), Schedule Construction, Claims Analysis, Construction Management, Delay Damages
Expert provides expert critical path method (CPM) schedule development/review/analysis and construction claims analysis, expert witness testimony, and project management consulting, to the engineering and construction industry. Clients include, Owners, developers, contractors, law firms and surety insurance companies. Types of projects…
International Investments, China Investments, Technology Business Management, Expert Witness
Expert manages international investments to develop maximum financial gain and to manage risk. The Expert has assembled extensive resources over many years from China, Hong Kong, Singapore, and other countries. Broad research and evaluation by Expert includes international trends, forecasts,…
Corporate Turnarounds, Crisis Management, Financial Restructuring, Re-financing
Expert is President and active Project Director / Senior Consultant in boutique consulting / interim management firm, with hands-on style & proven track-record. He specializes in restoring wealth in distressed and under-performing companies via following services (A – D): A.…