Find an Expert
Mechanics (Stress, Dynamics, Test), Modeling (FEA, CFD, Chemical), Machine Design, Controls
At Cessna, Expert designed the pressure cabin, empennage, and main spar carry through for the 441 Conquest and 650 Citation 2. His other engineering responsibilities included stress measurement (strain gauges, brittle coatings), solids modeling (NASTRAN), and FAA certification report authoring.…
Software Development, Technical Writing, and Project Management
Expert has experience with Software development tools for embedded systems engineers, marketing, project management, and technical publishing. The technical publications Expert develops show three essential qualities: close attention to the needs of the audience, correct content, and a clean look…
Process Automation: Process Control, Computer System Validation, Alarm Management, & Modeling
Expert served for several years as a major pharmaceutical company's chief Quality Assurance GMP/GLP computer validation auditor. He chaired the team that developed the company's first policy and guidelines regarding computer validation,- and served for several years as the company's…
Disposable Hygiene Products, Manufacturing, Quality, Product Development and Cost Analysis
Expert has applied his quality management background to set up “acceptable quality standards” in many companies and industries as well. He has selected alternative tools and systems to match with the needs of the environment as well the level of…
Management and Technology for Aluminum, Magnesium, Chemicals and Environmental
Directed the evaluation and selection of technology recommended for aluminum smelter expansions and new green site facilities. Directed equipment and technology retrofit in an operating plant to increase metal production by 10%. Directed the replacement of an existing plant-wide process…
Electrical Power Engineering, Energy Auditing
Expert teaches a course on the theoretical and practical aspects of alternating current transformers. This course is a must for utility and industrial electrical engineers, who have the responsibility of keeping their electrical system on-line. A transformer is a very…
Surface Texture and Operational Characteristics of Machines
The expert is most experienced in the subset of surface science related to mathematics and mechanics of surface irregularities on micro- and macro scales and their contact interaction. In addition he has experience in the field of surface metrology and…
Analog, Mixed-Signal, Low-Power VLSI, SOI, SOS, Image Sensors, Sensors, Biomedical Instrumentation,
Expert provides custom analog IC design, mixed-signal and RF design, IC layout and verification, and development services. He also creates mixed-signal and analog modules for SoC and ASIC chips used in applications such as analog-front-ends (AFE) and transceiver modules for…
Biotechnological Pharmaceutical Chemical Process Development Design Engineering
Expert has applied his extensive background in chemical engineering in various areas including pharmaceutical process and product development; developing new products for pharmaceutical and consumer industries; process, equipment, and analytical method validation in biotechnology areas; and designing and improving various…
Process Engineering and Chemistry of Inorganic Chemicals
Expert W. Expert has 20 years’ experience in process design and operation of chlorine manufacturing facilities. He has worked on projects including the development of material and energy balances and the equipment sizing for a 15% chlorine plant expansion, troubleshooting…