Find an Expert
Aquaculture, Small-Scale Fisheries, Trout, Tilapia and Carp Farming, etc.
He has worked in aquaculture development for most of the 27 years since graduating with an M.Sc in Aquaculture and Fisheries Management from the University of Stirling. He also has a Ph.D. in aquaculture (Tilapia Nutrition) from Stirling University. He…
Development and Assurance of High-Assurance / Safety-Critical Software & Embedded Systems
Expert has substantial experience with software safety and reliability. Most of his career has been spent working with high-assurance systems and safety-critical software. He has developed software for commercial aviation systems, for medical devices, and for industrial controls and safety…
Waterway Project Planning & Engineering Design, EIS’s, Permitting, Contaminated Sediment Remediation
Land-Forming and Waterway Engineering Project Development The processes associated with stepping through the “Project Continuum” associated with today’s high complexity/high diversity land-forming and waterway engineering projects are overwhelming. To progress through the gauntlet, each project must comprehensively address a spectrum…
Antitrust, Banking, Damages, Demography, Discrimination, Finance; IP Surveys, Statistics, Economics
Expert and his firm are responsible for all Quality Control on all litigation support activities for the Department of Justice. With an office of 15 professionals in the Washington DC metro area, they sample and evaluate the work of multiple…
Electric Utilities, Purchasing, Sourcing, Transformers, Total Cost Ownership Analysis, Material Mgt.
Expert has been the Business Head of a service provider for outsourcing of business processes like Purchasing. He has a framework that can help business determine what services can be outsourced and why. He can provide guidance on pros and…
Litigation Involving Surveys and Assessments in the Workplace & Employee Motivation and Performance
Expert received an MA in research methodology from the University of Chicago, as well as an M. Phil. and a Ph.D. in experimental social psychology from Columbia University. He has more than 20 years of consulting experience designing and analyzing…
Materials Science, Particularly Corrosion: Microbial Corrosion, Materials Selection, Biodegradation
Biodegradation mainly refers to enhanced degradation and deterioration of non-metallic materials such as concrete and polymers to distinguish it from microbial corrosion of metals. Under certain circumstances, there are groups of micro-organisms that are capable of attacking these materials and…
Pharmaceutical & Life Science Research and Manufacturing, New Drug Discovery, Therapeutic Strategy
By using standard analytical tools of cellular and molecular biology he has elucidated the molecular mode of action of an anti-diabetic candidate BMOV on the key components of insulin signaling cascades like IR Kinase (IRK) and IRS complexes including gross…
Highway and Rail Accident Reconstruction and Forensic Analysis of Construction
Expert has applied his academic training and traffic and transportation engineering design background to accident reconstruction in a number of cases. He has developed construction drawings, specification and cost estimates for a number of highway projects including maintenance of traffic…
Accident Reconstruction,Brakes,Vehicle Safety;Automotive Engineering;Airbags,Seat Belts, Restraints
Expert (Ph.D., M. Eng) is the Principal Engineer of an internationally recognized consulting engineering firm with over 30 years of Scientific Motor Vehicle & Traffic Accident Reconstruction experience. Expert is an Automotive Engineer (M. Eng.) with Doctorate (Ph.D.) in Automotive…